Every decision before the first line of code
I built a pipeline that takes a client from discovery call to working bot with one engineer driving. The first build went from 7 weeks to 2 days. Most of the work was refusing to let it guess.
I built a pipeline that takes a client from discovery call to working bot with one engineer driving. The first build went from 7 weeks to 2 days. Most of the work was refusing to let it guess.